Image maybe reresentation
See specs for product details.
TLV1805DBVR
Part No.: TLV1805DBVR
RoHs Status: RoHS Compliant
Manufacturer/Brand: Texas Instruments
Stock Condition: In stock:11775
Description: IC COMPARATOR 1 GEN PUR SOT23-6
Ship From: Hong Kong
Datasheets:
Shhipment Way: DHL/Fedex/TNT/UPS/EM
Ladder Price:
1+
$0.97
3000+
$0.4128
Recent price fluctuations have been significant. By inquiring now, you may get a price up to 50% lower than expected.
WARM TIPS
  • Product parameters show on this page may contain errors. Please refer to datasheet for specific product information.
  • Please contact our sales staff for a real-time quotation as our website may not reflect the latest information on all products. The final price is subject to the inquiry result.
REQUEST QUOTE
Please fill in all required fields and click " SUBMIT REQUEST"
*Part No. TLV1805DBVR
*Quantity
Target Price(USD)
Company Name
*Contact Name
*Your Email
Phone
Message
*Company Type
OEM/CEM
Distributor/Reseller
Others
Submit Request
Part No.
TLV1805DBVR
CMRR, PSRR (Typ)
80dB CMRR, 95dB PSRR
Operating Temperature
-40°C ~ 125°C
Propagation Delay (Max)
500ns (Typ)
Output Type
Push-Pull
Mounting Type
Surface Mount
Product Status
Active
Supplier Device Package
SOT-23-6
Voltage - Input Offset (Max)
4.5mV @ 40V
Type
General Purpose
Package / Case
SOT-23-6
Voltage - Supply, Single/Dual (±)
3.3V ~ 40V
Number of Elements
1
Package
Tape & Reel (TR);Cut Tape (CT);Digi-Reel®
Current - Input Bias (Max)
0.05pA (Typ)
Hysteresis
14mV
Current - Quiescent (Max)
200µA
Contact & Inquiry
Innovative solutions. Customised to your specific needs.
FIND US
UNIT2223,22/F YAN'S TOWER 25 - 27 WONG CHUK HANG RD ABERDEEN HONG KONG
QUICK INQUIRY Send the product number you need at any time, we will give you the first time accurate reply Submit RFQ
ISO-9001 LinkedIn
© 2025 SUNETHER TECHNOLOGY LIMITED. All rights reserved.