Image maybe reresentation
See specs for product details.

TPS2H000BQPWPRQ1

Part No.: TPS2H000BQPWPRQ1
RoHs Status: RoHS Compliant
Manufacturer/Brand: Texas Instruments
Stock Condition: In stock:526
Description: IC PWR SWTCH N-CHAN 1:1 16HTSSOP
Ship From: Hong Kong
Datasheets:
Shhipment Way: DHL/Fedex/TNT/UPS/EM
Ladder Price:
1+
$2.44
2000+
$0.7662
Recent price fluctuations have been significant. By inquiring now, you may get a price up to 50% lower than expected.
WARM TIPS
  • Product parameters show on this page may contain errors. Please refer to datasheet for specific product information.
  • Please contact our sales staff for a real-time quotation as our website may not reflect the latest information on all products. The final price is subject to the inquiry result.
REQUEST QUOTE
Please fill in all required fields and click " SUBMIT REQUEST"
*Part No. TPS2H000BQPWPRQ1
*Quantity
Target Price(USD)
Company Name
*Contact Name
*Your Email
Phone
Message
*Company Type
OEM/CEM
Distributor/Reseller
Others
Submit Request
Part No.
TPS2H000BQPWPRQ1
Operating Temperature
-40°C ~ 125°C (TA)
Output Type
N-Channel
Switch Type
General Purpose
Grade
Automotive
Output Configuration
High Side
Voltage - Load
3.4V ~ 40V
Mounting Type
Surface Mount
Rds On (Typ)
1Ohm
Product Status
Active
Current - Output (Max)
750mA
Supplier Device Package
16-HTSSOP
Number of Outputs
2
Qualification
AEC-Q100
Fault Protection
Current Limiting (Adjustable), Over Temperature
Package / Case
16-PowerTSSOP (0.173\
Features
Status Flag
Package
Tape & Reel (TR);Cut Tape (CT);Digi-Reel®
Voltage - Supply (Vcc/Vdd)
Not Required
Interface
On/Off
Contact & Inquiry
Innovative solutions. Customised to your specific needs.
FIND US
UNIT2223,22/F YAN'S TOWER 25 - 27 WONG CHUK HANG RD ABERDEEN HONG KONG
QUICK INQUIRY Send the product number you need at any time, we will give you the first time accurate reply Submit RFQ
ISO-9001 LinkedIn
© 2025 SUNETHER TECHNOLOGY LIMITED. All rights reserved.